מהן כישורי התפעול של מכונת בריקט RDF?
When using the biomass briquette extruder, a small amount of material should be fed evenly. First, add materials with a moisture content of >40% עד שכל חורי המות של הציוד ייפרקו. בשלב זה, הלחץ, הטמפרטורה ופרמטרים אחרים של הציוד נמצאים בתנאים רגילים. הפריקה אורכת 10 דקות. לאחר מכן הוסף חומרים עם<20% moisture content until the material is discharged normally. The moisture content of raw materials during the production process must be controlled within 20%. If the moisture content is too high, the molding density will be low, so the feeding speed should be reduced and the residence time should be extended; when the raw material is too dry, water should be added appropriately for lubrication. During the production process, avoid frequent starts or overload operation. When there is a sudden power outage or overload, the machine should be stopped immediately, the raw materials in the machine warehouse should be cleaned, and it can only be started after everything is normal.

| דֶגֶם | כּוֹחַ | קיבולת | גודל לבריק | כמות חורים |
| חבר כנסת-550 | 55 קילוואט | 1t/h-1.5t/h | 32*32 מ"מ | 36 יחידות |
| חבר כנסת-750 | 75 קילוואט | 1.5t/h-2t/h | 32*32 מ"מ | 54 יחידות |
| חבר כנסת-900 | 90 קילוואט | 2t/h-2.5t/h | 32*32 מ"מ | 72 יחידות |
| חבר כנסת-1600 | 160 קילוואט | 2.5t/h-3t/h | 32*32 מ"מ | 120 יחידות |
כאשר מכונת בריקט אבק עץ מושבתת, יש גם דברים שצריך לשים לב אליהם. הכינו חומרים רטובים עם תכולת לחות של כ-50%. בהתאם לפריקה של חומרים בתפזורת, הגדל את הכמות מקטנה לגדולה עד שכל חורי המות ישפרו חומרים בתפזורת. הפסק להאכיל ולאחר מכן המשך ברצף. זמן השבתה. בעת כיבוי, על המכונה להמתין עד לפריקת החומרים לחלוטין לפני שניתן יהיה לכבות אותה. אסור לכבות אותו כשהוא טעון במלואו. לאחר הכיבוי, בדוק ונקה את שאר החומרים, ונקה את הציוד והסביבה הסובבת. החומרים המוגמרים צריכים להיות עמידים בפני לחות ועמידים למים, ואזור האחסון חייב להיות מאוורר ויבש.